The 420kW dual-gun modular AC-DC fast charger targets public parking hubs and retail destinations, where uptime and quick service access decide revenue. With CCS1 and NACS outlets, a 200V-1000V DC window and OCPP 1.6J connectivity, it delivers predictable high-power charging while keeping installation and commissioning simple. This DC fast charging station pairs high utilisation with low maintenance overhead.
![]() |
1. Modular AC-DC Power Topology and Conversion ChainEvery cabinet is load tested before shipment and arrives with a wiring map covering contactors, fuses and surge arrestors for fast commissioning. Busbar layout, magnetic components and cooling channels are shared across the 420kW family, which shortens lead times and simplifies spare part stocking. Galvanic isolation between grid and vehicle protects both sides during fault events and meets the insulation requirements behind CE and IEC 61851 compliance. The 420kW dual-gun unit is built around a modular AC-DC topology that rectifies three-phase AC input onto a regulated DC bus before power reaches the vehicle inlet. Commissioning takes under an hour with the guided setup wizard. Matching power modules are documented in the datasheet. |
2. 200V-1000V Wide Voltage Output With Constant PowerA 1000V ceiling future-proofs the investment, because the same DC fast charging station serves today’s 400V fleets and tomorrow’s 800V platforms. Wide range voltage tracking keeps efficiency above 95 percent even when a deeply depleted pack pulls close to the 500A current ceiling. Cable assemblies rated 250A to 400A are matched to each outlet, and CCS1 and NACS leads are available in lengths from 4 to 8 metres. Pre-charge sequencing limits inrush current, shielding vehicle contactors and DC link capacitors from stress during every plug-in. Output spans 200V to 1000V DC, covering 400V and 800V vehicle architectures from compact city cars to heavy-duty tractors. |
![]() |
![]() |
3. 40kW Hot-Swap Power Modules and N+1 RedundancyModule-level diagnostics flag degrading fans and capacitors long before they cause a stoppage, enabling condition-based maintenance. Replacement modules ship pre-calibrated, and the controller recognises a new unit automatically once it is fully seated. Each module reports voltage, current, temperature and fan speed to the controller, which derates or isolates any unit drifting out of tolerance. Speed-controlled fans and intelligent airflow keep acoustic noise near 65 dB, which suits residential, hospital and retail locations. Modules slide out from the front, so service engineers never need rear clearance in tight parking layouts or wall-adjacent installations. Commissioning takes under an hour with the guided setup wizard. Compatible EV charging connectors are listed separately. |
4. Dynamic Power Allocation Across Dual OutletsScheduling profiles prioritise buses in the morning and light vehicles in the evening without manual intervention. When a second connector activates, the controller splits output according to state of charge rather than a fixed schedule. Load balancing also watches site demand, trimming total draw when the transformer or building load approaches its limit. Session logs record delivered energy per outlet, which simplifies billing, reconciliation and fleet cost allocation. Operators set allocation rules per site, per connector or per tariff window through the cloud portal, with no on-site reprogramming. Priority rules can reserve one outlet for emergency fleets while the other follows a normal queue, all configured remotely. Site rules are tuned from the operator portal. |
![]() |
![]() |
5. Outdoor IP55 Enclosure Built for Public SitesThe enclosure is rated IP55, with filtered intake louvres and a sealed electronics compartment that shrugs off rain, dust and washdown. A powder-coated steel body with anti-corrosion treatment suits coastal, industrial and roadside installations. Optional heating, ventilation and lighting kits extend operation to cold storage yards and dusty mining roads. Cable management hooks keep CCS1 and NACS leads off the ground, extending connector life in busy public car parks. Ambient range runs from minus 30 to plus 55 degrees Celsius, with internal heaters protecting the 7-inch display in freezing conditions. Each unit is ingress tested at the factory and ships with CE documentation covering insulation and earth continuity checks. Installation drawings cover plinth and cable routing. |
6. Smart Payment, OCPP Management and Energy IntegrationThe controller exposes smart charging profiles, so a central system can cap site load during peak tariff periods. Remote diagnostics, firmware updates and tariff changes are pushed over the air, cutting truck rolls for routine maintenance. An open API and Modbus TCP option let the DC fast charger link with solar, storage and building management systems. Local storage keeps sessions running if connectivity drops, then synchronises records once the link returns. OCPP 1.6J adds certificate handling and stronger message security for public networks that must satisfy national roaming rules. Every session produces a metered record covering start, stop and energy delivered, mapping directly to the operator’s billing engine. Backend integration follows the OCPP specification. |
![]() |
Deployment Support and Accessories
Projects usually pair the cabinet with Type 2 to Type 2 cables and a OCPP protocol controllers, all supplied from one factory. Engineering teams can review the company profile before order, while commercial questions go through the contact our team page. Standard builds ship in four to six weeks, and documentation covers wiring, grounding and network setup.
Frequently Asked Questions
What protection level is needed for roadside installation?
IP55 is the baseline for outdoor public sites, combined with surge arrestors, residual current detection and an emergency stop. Coastal or dusty locations should add the anti-corrosion coating and filter service kit.
How is maintenance handled when a power module fails?
Modules are hot-swappable from the front. A technician isolates the affected unit, slides it out and seats a pre-calibrated replacement while the second outlet keeps serving traffic. N plus one redundancy keeps rated output available throughout.
Does the station support solar and battery storage integration?
The DC bus is storage-ready. Solar MPPT or a BESS cabinet can feed the link directly, and the controller can cap grid import during peak tariffs. This suits microgrid and carport projects where demand charges dominate operating cost.
What payment options are available for public drivers?
RFID card, mobile app, QR code, ISO 15118 plug and charge and an optional POS terminal for contactless bank cards. All methods write to the same metered session record, so reconciliation stays simple. Connector options are listed on our EV charging connector page.
What output voltage range does the 420kW unit support?
The charger delivers 200V to 1000V DC at up to 500A, so it serves 400V passenger cars and 800V heavy vehicles from the same outlet. Constant power holds 420kW from about 500V upward, which shortens charging time on modern high-voltage packs.
How does DCDC architecture differ from a conventional AC-DC charger?
A DCDC stage accepts a DC bus from solar or battery storage and converts it directly, skipping one rectification step. That raises round-trip efficiency and lets the modular AC-DC platform operate during grid outages when paired with a BESS cabinet.
As a commercial DC fast charger, the platform is specified for operators who need predictable uptime from a DC fast charging station.
Fleet managers comparing a DC fast charging station against split systems value the single-cabinet service model of this DC fast charger.
The DC fast charging station ships with commissioning support, and every DC fast charger is backed by regional spares.
Choosing a DC fast charger with documented test reports keeps procurement audits simple for any commercial EV charger project.












