MIDA 150kW 1000V Wide Voltage DC EV Charger Dual Guns with IP55 Weatherproof Enclosure

Short Description:

150kW dual-gun modular AC-DC fast charger with CCS2 and CCS1 outlets and 200V-1000V DC output. OCPP 1.6J certified, IP55 outdoor enclosure, hot-swap 30kW modules and dynamic power sharing for public parking hubs and retail destinations.


Product Detail

FAQ

Product Tags

The 150kW dual-gun modular AC-DC fast charger targets public parking hubs and retail destinations, where uptime and quick service access decide revenue. With CCS2 and CCS1 outlets, a 200V-1000V DC window and OCPP 1.6J connectivity, it delivers predictable high-power charging while keeping installation and commissioning simple. This DC fast charging station pairs high utilisation with low maintenance overhead.

150kW DCDC converter cabinet architecture - 150kW CCS2 and CCS1

1. Modular AC-DC Power Topology and Conversion Chain

Power conversion is separated from control logic, so firmware updates and diagnostics never interrupt an active charging session. Every cabinet is load tested before shipment and arrives with a wiring map covering contactors, fuses and surge arrestors for fast commissioning. The 150kW dual-gun unit is built around a modular AC-DC topology that rectifies three-phase AC input onto a regulated DC bus before power reaches the vehicle inlet. Efficiency peaks at 96 percent and stays above 94 percent from light load to full output, cutting energy cost for high-utilisation sites. Bidirectional-ready bus design lets the same platform accept solar or battery energy storage input without a second conversion stage. Matching power modules are documented in the datasheet.

2. 200V-1000V Wide Voltage Output With Constant Power

Constant power operation holds the full 150kW from roughly 500V upward, so an 800V pack charges at rated rate instead of tapering early. Voltage and current limits are negotiated over the control pilot, then confirmed by the battery management system before the DC contactors close. A 1000V ceiling future-proofs the investment, because the same DC fast charging station serves today’s 400V fleets and tomorrow’s 800V platforms. Wide range voltage tracking keeps efficiency above 95 percent even when a deeply depleted pack pulls close to the 250A current ceiling. Continuous insulation monitoring isolates the outlet whenever leakage approaches the configured threshold, protecting technicians and vehicles alike.

Wide voltage DC output up to 1000V - 150kW CCS2 and CCS1
Hot-swappable power modules inside the charger - 150kW CCS2 and CCS1

3. 30kW Hot-Swap Power Modules and N+1 Redundancy

Module-level diagnostics flag degrading fans and capacitors long before they cause a stoppage, enabling condition-based maintenance. N plus one redundancy keeps rated 150kW available even while one module is pulled for service, which matters on revenue-critical corridors. Replacement modules ship pre-calibrated, and the controller recognises a new unit automatically once it is fully seated. Power is delivered by 30kW hot-swappable modules, so a failed unit is exchanged in minutes without isolating the whole cabinet. Each module reports voltage, current, temperature and fan speed to the controller, which derates or isolates any unit drifting out of tolerance. Compatible EV charging connectors are listed separately.

4. Dynamic Power Allocation Across Dual Outlets

Priority rules can reserve one outlet for emergency fleets while the other follows a normal queue, all configured remotely. Scheduling profiles prioritise buses in the morning and light vehicles in the evening without manual intervention. Because capacity follows demand, the DC fast charging station avoids the idle-outlet penalty that drags down utilisation on paired connectors. Dynamic power allocation distributes available capacity across outlets in real time, letting a single vehicle draw the full 150kW. Session logs record delivered energy per outlet, which simplifies billing, reconciliation and fleet cost allocation. When a second connector activates, the controller splits output according to state of charge rather than a fixed schedule. Site rules are tuned from the operator portal.

Dynamic power sharing between charging guns - 150kW CCS2 and CCS1
Weatherproof outdoor charging cabinet - 150kW CCS2 and CCS1

5. Outdoor IP55 Enclosure Built for Public Sites

Each unit is ingress tested at the factory and ships with CE documentation covering insulation and earth continuity checks. Front and side service access is available, and the base frame accepts either anchor bolts or a concrete plinth. Surge protection, residual current detection and emergency stop are integrated, and the cabinet is engineered for a ten-year outdoor service life. The enclosure is rated IP55, with filtered intake louvres and a sealed electronics compartment that shrugs off rain, dust and washdown. Ambient range runs from minus 30 to plus 55 degrees Celsius, with internal heaters protecting the 7-inch display in freezing conditions. Installation drawings cover plinth and cable routing.

6. Smart Payment, OCPP Management and Energy Integration

The controller exposes smart charging profiles, so a central system can cap site load during peak tariff periods. An open API and Modbus TCP option let the DC fast charger link with solar, storage and building management systems. Communication runs over OCPP 1.6J, so the station integrates with almost any back office without custom middleware. Drivers authenticate by RFID card, mobile app, QR code or ISO 15118 plug and charge, with an optional POS terminal for bank card payment. Multi-language interface, configurable tariff screens and branded start pages help operators monetise the charging session itself. Local storage keeps sessions running if connectivity drops, then synchronises records once the link returns. Backend integration follows the OCPP specification.

Payment terminal and OCPP network controller - 150kW CCS2 and CCS1

Deployment Support and Accessories

Projects usually pair the cabinet with Type 2 to Type 2 cables and a OCPP protocol controllers, all supplied from one factory. Engineering teams can review the company profile before order, while commercial questions go through the contact our team page. Standard builds ship in four to six weeks, and documentation covers wiring, grounding and network setup.

Frequently Asked Questions

Which OCPP version should an operator choose?

OCPP 1.6J covers the widest installed base of back offices today. OCPP 1.6J is specified here for certificate handling, plug and charge support and stronger message security. Both profiles work with standard roaming hubs, and the protocol controller datasheet explains the mapping.

What protection level is needed for roadside installation?

IP55 is the baseline for outdoor public sites, combined with surge arrestors, residual current detection and an emergency stop. Coastal or dusty locations should add the anti-corrosion coating and filter service kit.

How is maintenance handled when a power module fails?

Modules are hot-swappable from the front. A technician isolates the affected unit, slides it out and seats a pre-calibrated replacement while the second outlet keeps serving traffic. N plus one redundancy keeps rated output available throughout.

Does the station support solar and battery storage integration?

The DC bus is storage-ready. Solar MPPT or a BESS cabinet can feed the link directly, and the controller can cap grid import during peak tariffs. This suits microgrid and carport projects where demand charges dominate operating cost.

What payment options are available for public drivers?

RFID card, mobile app, QR code, ISO 15118 plug and charge and an optional POS terminal for contactless bank cards. All methods write to the same metered session record, so reconciliation stays simple. Connector options are listed on our EV charging connector page.

What output voltage range does the 150kW unit support?

The charger delivers 200V to 1000V DC at up to 250A, so it serves 400V passenger cars and 800V heavy vehicles from the same outlet. Constant power holds 150kW from about 500V upward, which shortens charging time on modern high-voltage packs.

As a commercial DC fast charger, the platform is specified for operators who need predictable uptime from a DC fast charging station.

Fleet managers comparing a DC fast charging station against split systems value the single-cabinet service model of this DC fast charger.

The DC fast charging station ships with commissioning support, and every DC fast charger is backed by regional spares.

Choosing a DC fast charger with documented test reports keeps procurement audits simple for any commercial EV charger project.









  • Previous:
  • Next:

  • Write your message here and send it to us