The 80kW multi-gun DCDC solar-battery fast charger targets industrial microgrids and solar carports, where uptime and quick service access decide revenue. With CCS2 and CCS1 outlets, a 200V-1000V DC window and OCPP 1.6J connectivity, it delivers predictable high-power charging while keeping installation and commissioning simple. This DC fast charging station pairs high utilisation with low maintenance overhead.
![]() |
1. DCDC Solar-Battery Power Topology and Conversion ChainEvery cabinet is load tested before shipment and arrives with a wiring map covering contactors, fuses and surge arrestors for fast commissioning. Power conversion is separated from control logic, so firmware updates and diagnostics never interrupt an active charging session. A single controller supervises rectification, isolation and metering, which keeps the power path short and trims conversion losses across the whole load range. Galvanic isolation between grid and vehicle protects both sides during fault events and meets the insulation requirements behind CE and IEC 61851 compliance. Busbar layout, magnetic components and cooling channels are shared across the 80kW family, which shortens lead times and simplifies spare part stocking. Matching power modules are documented in the datasheet. |
2. 200V-1000V Wide Voltage Output With Constant PowerWide range voltage tracking keeps efficiency above 95 percent even when a deeply depleted pack pulls close to the 125A current ceiling. Cable assemblies rated 250A to 400A are matched to each outlet, and CCS2 and CCS1 leads are available in lengths from 4 to 8 metres. Pre-charge sequencing limits inrush current, shielding vehicle contactors and DC link capacitors from stress during every plug-in. Voltage and current limits are negotiated over the control pilot, then confirmed by the battery management system before the DC contactors close. Precision metering at the outlet delivers Class B accuracy, so billed energy matches what the vehicle actually receives. |
![]() |
![]() |
3. 20kW Hot-Swap Power Modules and N+1 RedundancyA shared DC bus lets any module feed any outlet, removing the fixed pairing that limits conventional charging piles. Replacement modules ship pre-calibrated, and the controller recognises a new unit automatically once it is fully seated. Modules slide out from the front, so service engineers never need rear clearance in tight parking layouts or wall-adjacent installations. Each module reports voltage, current, temperature and fan speed to the controller, which derates or isolates any unit drifting out of tolerance. N plus one redundancy keeps rated 80kW available even while one module is pulled for service, which matters on revenue-critical corridors. Compatible EV charging connectors are listed separately. |
4. Dynamic Power Allocation Across Dual OutletsMatrix switching allows any module to serve any gun, so one cabinet can run a single 125A session or two lower-current sessions. Session logs record delivered energy per outlet, which simplifies billing, reconciliation and fleet cost allocation. Load balancing also watches site demand, trimming total draw when the transformer or building load approaches its limit. Because capacity follows demand, the DC fast charging station avoids the idle-outlet penalty that drags down utilisation on paired connectors. Scheduling profiles prioritise buses in the morning and light vehicles in the evening without manual intervention. Dynamic power allocation distributes available capacity across outlets in real time, letting a single vehicle draw the full 80kW. Site rules are tuned from the operator portal. |
![]() |
![]() |
5. Outdoor IP55 Enclosure Built for Public SitesThe bonded anti-glare touchscreen stays readable in direct sunlight and remains responsive through gloved operation. The enclosure is rated IP55, with filtered intake louvres and a sealed electronics compartment that shrugs off rain, dust and washdown. Surge protection, residual current detection and emergency stop are integrated, and the cabinet is engineered for a ten-year outdoor service life. Each unit is ingress tested at the factory and ships with CE documentation covering insulation and earth continuity checks. Optional heating, ventilation and lighting kits extend operation to cold storage yards and dusty mining roads. A powder-coated steel body with anti-corrosion treatment suits coastal, industrial and roadside installations. Installation drawings cover plinth and cable routing. |
6. Smart Payment, OCPP Management and Energy IntegrationRemote diagnostics, firmware updates and tariff changes are pushed over the air, cutting truck rolls for routine maintenance. Local storage keeps sessions running if connectivity drops, then synchronises records once the link returns. Every session produces a metered record covering start, stop and energy delivered, mapping directly to the operator’s billing engine. The controller exposes smart charging profiles, so a central system can cap site load during peak tariff periods. Communication runs over OCPP 1.6J, so the station integrates with almost any back office without custom middleware. An open API and Modbus TCP option let the DC fast charger link with solar, storage and building management systems. Backend integration follows the OCPP specification. |
![]() |
Deployment Support and Accessories
Projects usually pair the cabinet with Type 2 to Type 2 cables and a OCPP protocol controllers, all supplied from one factory. Engineering teams can review the company profile before order, while commercial questions go through the contact our team page. Standard builds ship in four to six weeks, and documentation covers wiring, grounding and network setup.
Frequently Asked Questions
Can the two guns charge at the same time at full power?
Yes, with dynamic allocation. Total capacity is shared, so one vehicle can take the full 80kW, or two vehicles can split it according to state of charge. Matrix switching means any module can serve either outlet, and rules are configured remotely.
Which OCPP version should an operator choose?
OCPP 1.6J covers the widest installed base of back offices today. OCPP 1.6J is specified here for certificate handling, plug and charge support and stronger message security. Both profiles work with standard roaming hubs, and the protocol controller datasheet explains the mapping.
What protection level is needed for roadside installation?
IP55 is the baseline for outdoor public sites, combined with surge arrestors, residual current detection and an emergency stop. Coastal or dusty locations should add the anti-corrosion coating and filter service kit.
How is maintenance handled when a power module fails?
Modules are hot-swappable from the front. A technician isolates the affected unit, slides it out and seats a pre-calibrated replacement while the second outlet keeps serving traffic. N plus one redundancy keeps rated output available throughout.
Does the station support solar and battery storage integration?
The DC bus is storage-ready. Solar MPPT or a BESS cabinet can feed the link directly, and the controller can cap grid import during peak tariffs. This suits microgrid and carport projects where demand charges dominate operating cost.
What payment options are available for public drivers?
RFID card, mobile app, QR code, ISO 15118 plug and charge and an optional POS terminal for contactless bank cards. All methods write to the same metered session record, so reconciliation stays simple. Connector options are listed on our EV charging connector page.
What output voltage range does the 80kW unit support?
The charger delivers 200V to 1000V DC at up to 125A, so it serves 400V passenger cars and 800V heavy vehicles from the same outlet. Constant power holds 80kW from about 500V upward, which shortens charging time on modern high-voltage packs.
As a commercial DC fast charger, the platform is specified for operators who need predictable uptime from a DC fast charging station.
Fleet managers comparing a DC fast charging station against split systems value the single-cabinet service model of this DC fast charger.
The DC fast charging station ships with commissioning support, and every DC fast charger is backed by regional spares.
Choosing a DC fast charger with documented test reports keeps procurement audits simple for any commercial EV charger project.
As a commercial DC fast charger, the platform is specified for operators who need predictable uptime from a DC fast charging station.