The 160kW dual-gun modular AC-DC fast charger targets public parking hubs and retail destinations, where uptime and quick service access decide revenue. With CCS1 and CHAdeMO outlets, a 200V-1000V DC window and OCPP 2.0.1 connectivity, it delivers predictable high-power charging while keeping installation and commissioning simple. This DC fast charging station pairs high utilisation with low maintenance overhead.
![]() |
1. Modular AC-DC Power Topology and Conversion ChainEvery cabinet is load tested before shipment and arrives with a wiring map covering contactors, fuses and surge arrestors for fast commissioning. Bidirectional-ready bus design lets the same platform accept solar or battery energy storage input without a second conversion stage. The 160kW dual-gun unit is built around a modular AC-DC topology that rectifies three-phase AC input onto a regulated DC bus before power reaches the vehicle inlet. Power conversion is separated from control logic, so firmware updates and diagnostics never interrupt an active charging session. Efficiency peaks at 96 percent and stays above 94 percent from light load to full output, cutting energy cost for high-utilisation sites. Matching power modules are documented in the datasheet. |
2. 200V-1000V Wide Voltage Output With Constant PowerVoltage and current limits are negotiated over the control pilot, then confirmed by the battery management system before the DC contactors close. Wide range voltage tracking keeps efficiency above 95 percent even when a deeply depleted pack pulls close to the 250A current ceiling. Continuous insulation monitoring isolates the outlet whenever leakage approaches the configured threshold, protecting technicians and vehicles alike. A 1000V ceiling future-proofs the investment, because the same DC fast charging station serves today’s 400V fleets and tomorrow’s 800V platforms. Output spans 200V to 1000V DC, covering 400V and 800V vehicle architectures from compact city cars to heavy-duty tractors. |
![]() |
![]() |
3. 30kW Hot-Swap Power Modules and N+1 RedundancyEach module reports voltage, current, temperature and fan speed to the controller, which derates or isolates any unit drifting out of tolerance. Speed-controlled fans and intelligent airflow keep acoustic noise near 65 dB, which suits residential, hospital and retail locations. A shared DC bus lets any module feed any outlet, removing the fixed pairing that limits conventional charging piles. Thermal design holds junction temperatures stable at 50 degrees ambient, so the DC fast charger sustains rated output in hot climates. Module-level diagnostics flag degrading fans and capacitors long before they cause a stoppage, enabling condition-based maintenance. Compatible EV charging connectors are listed separately. |
4. Dynamic Power Allocation Across Dual OutletsMatrix switching allows any module to serve any gun, so one cabinet can run a single 250A session or two lower-current sessions. Session logs record delivered energy per outlet, which simplifies billing, reconciliation and fleet cost allocation. When a second connector activates, the controller splits output according to state of charge rather than a fixed schedule. Operators set allocation rules per site, per connector or per tariff window through the cloud portal, with no on-site reprogramming. Because capacity follows demand, the DC fast charging station avoids the idle-outlet penalty that drags down utilisation on paired connectors. Site rules are tuned from the operator portal. |
![]() |
![]() |
5. Outdoor IP55 Enclosure Built for Public SitesFront and side service access is available, and the base frame accepts either anchor bolts or a concrete plinth. Cable management hooks keep CCS1 and CHAdeMO leads off the ground, extending connector life in busy public car parks. Each unit is ingress tested at the factory and ships with CE documentation covering insulation and earth continuity checks. A powder-coated steel body with anti-corrosion treatment suits coastal, industrial and roadside installations. Optional heating, ventilation and lighting kits extend operation to cold storage yards and dusty mining roads. Ambient range runs from minus 30 to plus 55 degrees Celsius, with internal heaters protecting the 7-inch display in freezing conditions. Installation drawings cover plinth and cable routing. |
6. Smart Payment, OCPP Management and Energy IntegrationDrivers authenticate by RFID card, mobile app, QR code or ISO 15118 plug and charge, with an optional POS terminal for bank card payment. Communication runs over OCPP 2.0.1, so the station integrates with almost any back office without custom middleware. Remote diagnostics, firmware updates and tariff changes are pushed over the air, cutting truck rolls for routine maintenance. Multi-language interface, configurable tariff screens and branded start pages help operators monetise the charging session itself. Every session produces a metered record covering start, stop and energy delivered, mapping directly to the operator’s billing engine. Local storage keeps sessions running if connectivity drops, then synchronises records once the link returns. Backend integration follows the OCPP specification. |
![]() |
Deployment Support and Accessories
Projects usually pair the cabinet with Type 2 to Type 2 cables and a OCPP protocol controllers, all supplied from one factory. Engineering teams can review the company profile before order, while commercial questions go through the contact our team page. Standard builds ship in four to six weeks, and documentation covers wiring, grounding and network setup.
Frequently Asked Questions
Which OCPP version should an operator choose?
OCPP 1.6J covers the widest installed base of back offices today. OCPP 2.0.1 is specified here for certificate handling, plug and charge support and stronger message security. Both profiles work with standard roaming hubs, and the protocol controller datasheet explains the mapping.
What protection level is needed for roadside installation?
IP55 is the baseline for outdoor public sites, combined with surge arrestors, residual current detection and an emergency stop. Coastal or dusty locations should add the anti-corrosion coating and filter service kit.
How is maintenance handled when a power module fails?
Modules are hot-swappable from the front. A technician isolates the affected unit, slides it out and seats a pre-calibrated replacement while the second outlet keeps serving traffic. N plus one redundancy keeps rated output available throughout.
Does the station support solar and battery storage integration?
The DC bus is storage-ready. Solar MPPT or a BESS cabinet can feed the link directly, and the controller can cap grid import during peak tariffs. This suits microgrid and carport projects where demand charges dominate operating cost.
What payment options are available for public drivers?
RFID card, mobile app, QR code, ISO 15118 plug and charge and an optional POS terminal for contactless bank cards. All methods write to the same metered session record, so reconciliation stays simple. Connector options are listed on our EV charging connector page.
What output voltage range does the 160kW unit support?
The charger delivers 200V to 1000V DC at up to 250A, so it serves 400V passenger cars and 800V heavy vehicles from the same outlet. Constant power holds 160kW from about 500V upward, which shortens charging time on modern high-voltage packs.
As a commercial DC fast charger, the platform is specified for operators who need predictable uptime from a DC fast charging station.
Fleet managers comparing a DC fast charging station against split systems value the single-cabinet service model of this DC fast charger.
The DC fast charging station ships with commissioning support, and every DC fast charger is backed by regional spares.
Choosing a DC fast charger with documented test reports keeps procurement audits simple for any commercial EV charger project.













