300kW Dual Cable CCS2 1000V High Voltage DC Fast EV Charging Pile for Bus Depot

Short Description:

Modular AC-DC 300kW dual-gun EV charger built for bus depots and logistics yards: CCS2 outputs, 1000V constant power, hot-swap 40kW modules, dynamic load sharing, OCPP 1.6J backend integration and IP55 weatherproof housing.


Product Detail

FAQ

Product Tags

The 300kW dual-gun modular AC-DC fast charger targets bus depots and logistics yards, where uptime and quick service access decide revenue. With CCS2 outlets, a 200V-1000V DC window and OCPP 1.6J connectivity, it delivers predictable high-power charging while keeping installation and commissioning simple. This DC fast charging station pairs high utilisation with low maintenance overhead.

300kW DCDC converter cabinet architecture - 300kW CCS2

1. Modular AC-DC Power Topology and Conversion Chain

A single controller supervises rectification, isolation and metering, which keeps the power path short and trims conversion losses across the whole load range. Busbar layout, magnetic components and cooling channels are shared across the 300kW family, which shortens lead times and simplifies spare part stocking. Bidirectional-ready bus design lets the same platform accept solar or battery energy storage input without a second conversion stage. An active front end feeds isolated DC/DC stages inside each cabinet, so grid harmonics stay low while output voltage follows whatever the battery management system requests. Power conversion is separated from control logic, so firmware updates and diagnostics never interrupt an active charging session. Matching power modules are documented in the datasheet.

2. 200V-1000V Wide Voltage Output With Constant Power

Cable assemblies rated 250A to 400A are matched to each outlet, and CCS2 leads are available in lengths from 4 to 8 metres. Output spans 200V to 1000V DC, covering 400V and 800V vehicle architectures from compact city cars to heavy-duty tractors. Voltage and current limits are negotiated over the control pilot, then confirmed by the battery management system before the DC contactors close. A 1000V ceiling future-proofs the investment, because the same DC fast charging station serves today’s 400V fleets and tomorrow’s 800V platforms. Wide range voltage tracking keeps efficiency above 95 percent even when a deeply depleted pack pulls close to the 400A current ceiling.

Wide voltage DC output up to 1000V - 300kW CCS2
Hot-swappable power modules inside the charger - 300kW CCS2

3. 40kW Hot-Swap Power Modules and N+1 Redundancy

Module-level diagnostics flag degrading fans and capacitors long before they cause a stoppage, enabling condition-based maintenance. Speed-controlled fans and intelligent airflow keep acoustic noise near 65 dB, which suits residential, hospital and retail locations. Replacement modules ship pre-calibrated, and the controller recognises a new unit automatically once it is fully seated. N plus one redundancy keeps rated 300kW available even while one module is pulled for service, which matters on revenue-critical corridors. Modules slide out from the front, so service engineers never need rear clearance in tight parking layouts or wall-adjacent installations. Commissioning takes under an hour with the guided setup wizard. Compatible EV charging connectors are listed separately.

4. Dynamic Power Allocation Across Dual Outlets

Scheduling profiles prioritise buses in the morning and light vehicles in the evening without manual intervention. Dynamic power allocation distributes available capacity across outlets in real time, letting a single vehicle draw the full 300kW. Because capacity follows demand, the DC fast charging station avoids the idle-outlet penalty that drags down utilisation on paired connectors. Load balancing also watches site demand, trimming total draw when the transformer or building load approaches its limit. Operators set allocation rules per site, per connector or per tariff window through the cloud portal, with no on-site reprogramming. Session logs record delivered energy per outlet, which simplifies billing, reconciliation and fleet cost allocation. Site rules are tuned from the operator portal.

Dynamic power sharing between charging guns - 300kW CCS2
Weatherproof outdoor charging cabinet - 300kW CCS2

5. Outdoor IP55 Enclosure Built for Public Sites

A powder-coated steel body with anti-corrosion treatment suits coastal, industrial and roadside installations. Each unit is ingress tested at the factory and ships with CE documentation covering insulation and earth continuity checks. The enclosure is rated IP55, with filtered intake louvres and a sealed electronics compartment that shrugs off rain, dust and washdown. Front and side service access is available, and the base frame accepts either anchor bolts or a concrete plinth. Optional heating, ventilation and lighting kits extend operation to cold storage yards and dusty mining roads. Surge protection, residual current detection and emergency stop are integrated, and the cabinet is engineered for a ten-year outdoor service life. Installation drawings cover plinth and cable routing.

6. Smart Payment, OCPP Management and Energy Integration

OCPP 1.6J adds certificate handling and stronger message security for public networks that must satisfy national roaming rules. Local storage keeps sessions running if connectivity drops, then synchronises records once the link returns. An open API and Modbus TCP option let the DC fast charger link with solar, storage and building management systems. Multi-language interface, configurable tariff screens and branded start pages help operators monetise the charging session itself. Every session produces a metered record covering start, stop and energy delivered, mapping directly to the operator’s billing engine. The controller exposes smart charging profiles, so a central system can cap site load during peak tariff periods. Backend integration follows the OCPP specification.

Payment terminal and OCPP network controller - 300kW CCS2

Deployment Support and Accessories

Projects usually pair the cabinet with Type 2 to Type 2 cables and a OCPP protocol controllers, all supplied from one factory. Engineering teams can review the company profile before order, while commercial questions go through the contact our team page. Standard builds ship in four to six weeks, and documentation covers wiring, grounding and network setup.

Frequently Asked Questions

What protection level is needed for roadside installation?

IP55 is the baseline for outdoor public sites, combined with surge arrestors, residual current detection and an emergency stop. Coastal or dusty locations should add the anti-corrosion coating and filter service kit.

How is maintenance handled when a power module fails?

Modules are hot-swappable from the front. A technician isolates the affected unit, slides it out and seats a pre-calibrated replacement while the second outlet keeps serving traffic. N plus one redundancy keeps rated output available throughout.

Does the station support solar and battery storage integration?

The DC bus is storage-ready. Solar MPPT or a BESS cabinet can feed the link directly, and the controller can cap grid import during peak tariffs. This suits microgrid and carport projects where demand charges dominate operating cost.

What payment options are available for public drivers?

RFID card, mobile app, QR code, ISO 15118 plug and charge and an optional POS terminal for contactless bank cards. All methods write to the same metered session record, so reconciliation stays simple. Connector options are listed on our EV charging connector page.

What output voltage range does the 300kW unit support?

The charger delivers 200V to 1000V DC at up to 400A, so it serves 400V passenger cars and 800V heavy vehicles from the same outlet. Constant power holds 300kW from about 500V upward, which shortens charging time on modern high-voltage packs.

How does DCDC architecture differ from a conventional AC-DC charger?

A DCDC stage accepts a DC bus from solar or battery storage and converts it directly, skipping one rectification step. That raises round-trip efficiency and lets the modular AC-DC platform operate during grid outages when paired with a BESS cabinet.

Can the two guns charge at the same time at full power?

Yes, with dynamic allocation. Total capacity is shared, so one vehicle can take the full 300kW, or two vehicles can split it according to state of charge. Matrix switching means any module can serve either outlet, and rules are configured remotely.

As a commercial DC fast charger, the platform is specified for operators who need predictable uptime from a DC fast charging station.

Fleet managers comparing a DC fast charging station against split systems value the single-cabinet service model of this DC fast charger.

The DC fast charging station ships with commissioning support, and every DC fast charger is backed by regional spares.

Choosing a DC fast charger with documented test reports keeps procurement audits simple for any commercial EV charger project.









  • Previous:
  • Next:

  • Write your message here and send it to us