The 180kW dual-gun modular AC-DC fast charger targets public parking hubs and retail destinations, where uptime and quick service access decide revenue. With CCS2 and CCS1 outlets, a 200V-1000V DC window and OCPP 1.6J connectivity, it delivers predictable high-power charging while keeping installation and commissioning simple. This DC fast charging station pairs high utilisation with low maintenance overhead.
![]() |
1. Modular AC-DC Power Topology and Conversion ChainInput power factor stays above 0.99 and the wide input window keeps operation stable on weak rural feeders and long industrial spurs. Efficiency peaks at 96 percent and stays above 94 percent from light load to full output, cutting energy cost for high-utilisation sites. Power conversion is separated from control logic, so firmware updates and diagnostics never interrupt an active charging session. Bidirectional-ready bus design lets the same platform accept solar or battery energy storage input without a second conversion stage. A single controller supervises rectification, isolation and metering, which keeps the power path short and trims conversion losses across the whole load range. Matching power modules are documented in the datasheet. |
2. 200V-1000V Wide Voltage Output With Constant PowerContinuous insulation monitoring isolates the outlet whenever leakage approaches the configured threshold, protecting technicians and vehicles alike. Pre-charge sequencing limits inrush current, shielding vehicle contactors and DC link capacitors from stress during every plug-in. Precision metering at the outlet delivers Class B accuracy, so billed energy matches what the vehicle actually receives. Cable assemblies rated 250A to 400A are matched to each outlet, and CCS2 and CCS1 leads are available in lengths from 4 to 8 metres. Output spans 200V to 1000V DC, covering 400V and 800V vehicle architectures from compact city cars to heavy-duty tractors. |
![]() |
![]() |
3. 30kW Hot-Swap Power Modules and N+1 RedundancyModules slide out from the front, so service engineers never need rear clearance in tight parking layouts or wall-adjacent installations. Thermal design holds junction temperatures stable at 50 degrees ambient, so the DC fast charger sustains rated output in hot climates. Replacement modules ship pre-calibrated, and the controller recognises a new unit automatically once it is fully seated. Each module reports voltage, current, temperature and fan speed to the controller, which derates or isolates any unit drifting out of tolerance. Power is delivered by 30kW hot-swappable modules, so a failed unit is exchanged in minutes without isolating the whole cabinet. Compatible EV charging connectors are listed separately. |
4. Dynamic Power Allocation Across Dual OutletsOperators set allocation rules per site, per connector or per tariff window through the cloud portal, with no on-site reprogramming. Load balancing also watches site demand, trimming total draw when the transformer or building load approaches its limit. Because capacity follows demand, the DC fast charging station avoids the idle-outlet penalty that drags down utilisation on paired connectors. Priority rules can reserve one outlet for emergency fleets while the other follows a normal queue, all configured remotely. Matrix switching allows any module to serve any gun, so one cabinet can run a single 250A session or two lower-current sessions. Site rules are tuned from the operator portal. |
![]() |
![]() |
5. Outdoor IP55 Enclosure Built for Public SitesOptional heating, ventilation and lighting kits extend operation to cold storage yards and dusty mining roads. Front and side service access is available, and the base frame accepts either anchor bolts or a concrete plinth. The bonded anti-glare touchscreen stays readable in direct sunlight and remains responsive through gloved operation. A powder-coated steel body with anti-corrosion treatment suits coastal, industrial and roadside installations. Cable management hooks keep CCS2 and CCS1 leads off the ground, extending connector life in busy public car parks. Each unit is ingress tested at the factory and ships with CE documentation covering insulation and earth continuity checks. Installation drawings cover plinth and cable routing. |
6. Smart Payment, OCPP Management and Energy IntegrationMulti-language interface, configurable tariff screens and branded start pages help operators monetise the charging session itself. Every session produces a metered record covering start, stop and energy delivered, mapping directly to the operator’s billing engine. Communication runs over OCPP 1.6J, so the station integrates with almost any back office without custom middleware. Local storage keeps sessions running if connectivity drops, then synchronises records once the link returns. Remote diagnostics, firmware updates and tariff changes are pushed over the air, cutting truck rolls for routine maintenance. An open API and Modbus TCP option let the DC fast charger link with solar, storage and building management systems. Backend integration follows the OCPP specification. |
![]() |
Deployment Support and Accessories
Projects usually pair the cabinet with Type 2 to Type 2 cables and a OCPP protocol controllers, all supplied from one factory. Engineering teams can review the company profile before order, while commercial questions go through the contact our team page. Standard builds ship in four to six weeks, and documentation covers wiring, grounding and network setup.
Frequently Asked Questions
Which OCPP version should an operator choose?
OCPP 1.6J covers the widest installed base of back offices today. OCPP 1.6J is specified here for certificate handling, plug and charge support and stronger message security. Both profiles work with standard roaming hubs, and the protocol controller datasheet explains the mapping.
What protection level is needed for roadside installation?
IP55 is the baseline for outdoor public sites, combined with surge arrestors, residual current detection and an emergency stop. Coastal or dusty locations should add the anti-corrosion coating and filter service kit.
How is maintenance handled when a power module fails?
Modules are hot-swappable from the front. A technician isolates the affected unit, slides it out and seats a pre-calibrated replacement while the second outlet keeps serving traffic. N plus one redundancy keeps rated output available throughout.
Does the station support solar and battery storage integration?
The DC bus is storage-ready. Solar MPPT or a BESS cabinet can feed the link directly, and the controller can cap grid import during peak tariffs. This suits microgrid and carport projects where demand charges dominate operating cost.
What payment options are available for public drivers?
RFID card, mobile app, QR code, ISO 15118 plug and charge and an optional POS terminal for contactless bank cards. All methods write to the same metered session record, so reconciliation stays simple. Connector options are listed on our EV charging connector page.
What output voltage range does the 180kW unit support?
The charger delivers 200V to 1000V DC at up to 250A, so it serves 400V passenger cars and 800V heavy vehicles from the same outlet. Constant power holds 180kW from about 500V upward, which shortens charging time on modern high-voltage packs.
How does DCDC architecture differ from a conventional AC-DC charger?
A DCDC stage accepts a DC bus from solar or battery storage and converts it directly, skipping one rectification step. That raises round-trip efficiency and lets the modular AC-DC platform operate during grid outages when paired with a BESS cabinet.
Can the two guns charge at the same time at full power?
Yes, with dynamic allocation. Total capacity is shared, so one vehicle can take the full 180kW, or two vehicles can split it according to state of charge. Matrix switching means any module can serve either outlet, and rules are configured remotely.
As a commercial DC fast charger, the platform is specified for operators who need predictable uptime from a DC fast charging station.
Fleet managers comparing a DC fast charging station against split systems value the single-cabinet service model of this DC fast charger.
The DC fast charging station ships with commissioning support, and every DC fast charger is backed by regional spares.
Choosing a DC fast charger with documented test reports keeps procurement audits simple for any commercial EV charger project.












