The 350kW multi-gun modular AC-DC fast charger targets bus depots and logistics yards, where uptime and quick service access decide revenue. With CCS2 and CCS1 outlets, a 200V-1000V DC window and OCPP 1.6J connectivity, it delivers predictable high-power charging while keeping installation and commissioning simple. This DC fast charging station pairs high utilisation with low maintenance overhead.
![]() |
1. Modular AC-DC Power Topology and Conversion ChainA single controller supervises rectification, isolation and metering, which keeps the power path short and trims conversion losses across the whole load range. Busbar layout, magnetic components and cooling channels are shared across the 350kW family, which shortens lead times and simplifies spare part stocking. Galvanic isolation between grid and vehicle protects both sides during fault events and meets the insulation requirements behind CE and IEC 61851 compliance. The 350kW multi-gun unit is built around a modular AC-DC topology that rectifies three-phase AC input onto a regulated DC bus before power reaches the vehicle inlet. Matching power modules are documented in the datasheet. |
2. 200V-1000V Wide Voltage Output With Constant PowerCable assemblies rated 250A to 400A are matched to each outlet, and CCS2 and CCS1 leads are available in lengths from 4 to 8 metres. Constant power operation holds the full 350kW from roughly 500V upward, so an 800V pack charges at rated rate instead of tapering early. Precision metering at the outlet delivers Class B accuracy, so billed energy matches what the vehicle actually receives. A 1000V ceiling future-proofs the investment, because the same DC fast charging station serves today’s 400V fleets and tomorrow’s 800V platforms. Voltage and current limits are negotiated over the control pilot, then confirmed by the battery management system before the DC contactors close. |
![]() |
![]() |
3. 40kW Hot-Swap Power Modules and N+1 RedundancySpeed-controlled fans and intelligent airflow keep acoustic noise near 65 dB, which suits residential, hospital and retail locations. Modules slide out from the front, so service engineers never need rear clearance in tight parking layouts or wall-adjacent installations. A shared DC bus lets any module feed any outlet, removing the fixed pairing that limits conventional charging piles. Module-level diagnostics flag degrading fans and capacitors long before they cause a stoppage, enabling condition-based maintenance. Each module reports voltage, current, temperature and fan speed to the controller, which derates or isolates any unit drifting out of tolerance. Compatible EV charging connectors are listed separately. |
4. Dynamic Power Allocation Across Dual OutletsOperators set allocation rules per site, per connector or per tariff window through the cloud portal, with no on-site reprogramming. Because capacity follows demand, the DC fast charging station avoids the idle-outlet penalty that drags down utilisation on paired connectors. Load balancing also watches site demand, trimming total draw when the transformer or building load approaches its limit. Matrix switching allows any module to serve any gun, so one cabinet can run a single 400A session or two lower-current sessions. Dynamic power allocation distributes available capacity across outlets in real time, letting a single vehicle draw the full 350kW. Site rules are tuned from the operator portal. |
![]() |
![]() |
5. Outdoor IP55 Enclosure Built for Public SitesAmbient range runs from minus 30 to plus 55 degrees Celsius, with internal heaters protecting the 7-inch display in freezing conditions. The enclosure is rated IP55, with filtered intake louvres and a sealed electronics compartment that shrugs off rain, dust and washdown. Cable management hooks keep CCS2 and CCS1 leads off the ground, extending connector life in busy public car parks. Surge protection, residual current detection and emergency stop are integrated, and the cabinet is engineered for a ten-year outdoor service life. The bonded anti-glare touchscreen stays readable in direct sunlight and remains responsive through gloved operation. A powder-coated steel body with anti-corrosion treatment suits coastal, industrial and roadside installations. Installation drawings cover plinth and cable routing. |
6. Smart Payment, OCPP Management and Energy IntegrationCommunication runs over OCPP 1.6J, so the station integrates with almost any back office without custom middleware. Drivers authenticate by RFID card, mobile app, QR code or ISO 15118 plug and charge, with an optional POS terminal for bank card payment. Remote diagnostics, firmware updates and tariff changes are pushed over the air, cutting truck rolls for routine maintenance. OCPP 1.6J adds certificate handling and stronger message security for public networks that must satisfy national roaming rules. Local storage keeps sessions running if connectivity drops, then synchronises records once the link returns. Multi-language interface, configurable tariff screens and branded start pages help operators monetise the charging session itself. Backend integration follows the OCPP specification. |
![]() |
Deployment Support and Accessories
Projects usually pair the cabinet with Type 2 to Type 2 cables and a OCPP protocol controllers, all supplied from one factory. Engineering teams can review the company profile before order, while commercial questions go through the contact our team page. Standard builds ship in four to six weeks, and documentation covers wiring, grounding and network setup.
Frequently Asked Questions
Does the station support solar and battery storage integration?
The DC bus is storage-ready. Solar MPPT or a BESS cabinet can feed the link directly, and the controller can cap grid import during peak tariffs. This suits microgrid and carport projects where demand charges dominate operating cost.
What payment options are available for public drivers?
RFID card, mobile app, QR code, ISO 15118 plug and charge and an optional POS terminal for contactless bank cards. All methods write to the same metered session record, so reconciliation stays simple. Connector options are listed on our EV charging connector page.
What output voltage range does the 350kW unit support?
The charger delivers 200V to 1000V DC at up to 400A, so it serves 400V passenger cars and 800V heavy vehicles from the same outlet. Constant power holds 350kW from about 500V upward, which shortens charging time on modern high-voltage packs.
How does DCDC architecture differ from a conventional AC-DC charger?
A DCDC stage accepts a DC bus from solar or battery storage and converts it directly, skipping one rectification step. That raises round-trip efficiency and lets the modular AC-DC platform operate during grid outages when paired with a BESS cabinet.
Can the two guns charge at the same time at full power?
Yes, with dynamic allocation. Total capacity is shared, so one vehicle can take the full 350kW, or two vehicles can split it according to state of charge. Matrix switching means any module can serve either outlet, and rules are configured remotely.
Which OCPP version should an operator choose?
OCPP 1.6J covers the widest installed base of back offices today. OCPP 1.6J is specified here for certificate handling, plug and charge support and stronger message security. Both profiles work with standard roaming hubs, and the protocol controller datasheet explains the mapping.
As a commercial DC fast charger, the platform is specified for operators who need predictable uptime from a DC fast charging station.
Fleet managers comparing a DC fast charging station against split systems value the single-cabinet service model of this DC fast charger.
The DC fast charging station ships with commissioning support, and every DC fast charger is backed by regional spares.
Choosing a DC fast charger with documented test reports keeps procurement audits simple for any commercial EV charger project.












