MIDA 60kW Level 3 Commercial DC EV Fast Charging Station OCPP 2.0.1 IP55 Certified

Short Description:

Modular AC-DC 60kW multi-gun EV charger built for public parking hubs and retail destinations: CCS2 and CCS1 outputs, 1000V constant power, hot-swap 20kW modules, dynamic load sharing, OCPP 2.0.1 backend integration and IP55 weatherproof housing.


Product Detail

FAQ

Product Tags

The 60kW multi-gun modular AC-DC fast charger targets public parking hubs and retail destinations, where uptime and quick service access decide revenue. With CCS2 and CCS1 outlets, a 200V-1000V DC window and OCPP 2.0.1 connectivity, it delivers predictable high-power charging while keeping installation and commissioning simple. This DC fast charging station pairs high utilisation with low maintenance overhead.

60kW DCDC converter cabinet architecture - 60kW CCS2 and CCS1

1. Modular AC-DC Power Topology and Conversion Chain

Busbar layout, magnetic components and cooling channels are shared across the 60kW family, which shortens lead times and simplifies spare part stocking. An active front end feeds isolated DC/DC stages inside each cabinet, so grid harmonics stay low while output voltage follows whatever the battery management system requests. Bidirectional-ready bus design lets the same platform accept solar or battery energy storage input without a second conversion stage. Every cabinet is load tested before shipment and arrives with a wiring map covering contactors, fuses and surge arrestors for fast commissioning. Power conversion is separated from control logic, so firmware updates and diagnostics never interrupt an active charging session. Matching power modules are documented in the datasheet.

2. 200V-1000V Wide Voltage Output With Constant Power

Constant power operation holds the full 60kW from roughly 500V upward, so an 800V pack charges at rated rate instead of tapering early. Pre-charge sequencing limits inrush current, shielding vehicle contactors and DC link capacitors from stress during every plug-in. Continuous insulation monitoring isolates the outlet whenever leakage approaches the configured threshold, protecting technicians and vehicles alike. Voltage and current limits are negotiated over the control pilot, then confirmed by the battery management system before the DC contactors close. Output spans 200V to 1000V DC, covering 400V and 800V vehicle architectures from compact city cars to heavy-duty tractors.

Wide voltage DC output up to 1000V - 60kW CCS2 and CCS1
Hot-swappable power modules inside the charger - 60kW CCS2 and CCS1

3. 20kW Hot-Swap Power Modules and N+1 Redundancy

Modules slide out from the front, so service engineers never need rear clearance in tight parking layouts or wall-adjacent installations. Speed-controlled fans and intelligent airflow keep acoustic noise near 65 dB, which suits residential, hospital and retail locations. Module-level diagnostics flag degrading fans and capacitors long before they cause a stoppage, enabling condition-based maintenance. Each module reports voltage, current, temperature and fan speed to the controller, which derates or isolates any unit drifting out of tolerance. A shared DC bus lets any module feed any outlet, removing the fixed pairing that limits conventional charging piles. Compatible EV charging connectors are listed separately.

4. Dynamic Power Allocation Across Dual Outlets

Load balancing also watches site demand, trimming total draw when the transformer or building load approaches its limit. When a second connector activates, the controller splits output according to state of charge rather than a fixed schedule. Because capacity follows demand, the DC fast charging station avoids the idle-outlet penalty that drags down utilisation on paired connectors. Dynamic power allocation distributes available capacity across outlets in real time, letting a single vehicle draw the full 60kW. Scheduling profiles prioritise buses in the morning and light vehicles in the evening without manual intervention. Session logs record delivered energy per outlet, which simplifies billing, reconciliation and fleet cost allocation. Site rules are tuned from the operator portal.

Dynamic power sharing between charging guns - 60kW CCS2 and CCS1
Weatherproof outdoor charging cabinet - 60kW CCS2 and CCS1

5. Outdoor IP55 Enclosure Built for Public Sites

The bonded anti-glare touchscreen stays readable in direct sunlight and remains responsive through gloved operation. A powder-coated steel body with anti-corrosion treatment suits coastal, industrial and roadside installations. Optional heating, ventilation and lighting kits extend operation to cold storage yards and dusty mining roads. Surge protection, residual current detection and emergency stop are integrated, and the cabinet is engineered for a ten-year outdoor service life. Each unit is ingress tested at the factory and ships with CE documentation covering insulation and earth continuity checks. Cable management hooks keep CCS2 and CCS1 leads off the ground, extending connector life in busy public car parks. Installation drawings cover plinth and cable routing.

6. Smart Payment, OCPP Management and Energy Integration

Remote diagnostics, firmware updates and tariff changes are pushed over the air, cutting truck rolls for routine maintenance. Local storage keeps sessions running if connectivity drops, then synchronises records once the link returns. Every session produces a metered record covering start, stop and energy delivered, mapping directly to the operator’s billing engine. Multi-language interface, configurable tariff screens and branded start pages help operators monetise the charging session itself. Drivers authenticate by RFID card, mobile app, QR code or ISO 15118 plug and charge, with an optional POS terminal for bank card payment. Communication runs over OCPP 2.0.1, so the station integrates with almost any back office without custom middleware. Backend integration follows the OCPP specification.

Payment terminal and OCPP network controller - 60kW CCS2 and CCS1

Deployment Support and Accessories

Projects usually pair the cabinet with Type 2 to Type 2 cables and a OCPP protocol controllers, all supplied from one factory. Engineering teams can review the company profile before order, while commercial questions go through the contact our team page. Standard builds ship in four to six weeks, and documentation covers wiring, grounding and network setup.

Frequently Asked Questions

Can the two guns charge at the same time at full power?

Yes, with dynamic allocation. Total capacity is shared, so one vehicle can take the full 60kW, or two vehicles can split it according to state of charge. Matrix switching means any module can serve either outlet, and rules are configured remotely.

Which OCPP version should an operator choose?

OCPP 1.6J covers the widest installed base of back offices today. OCPP 2.0.1 is specified here for certificate handling, plug and charge support and stronger message security. Both profiles work with standard roaming hubs, and the protocol controller datasheet explains the mapping.

What protection level is needed for roadside installation?

IP55 is the baseline for outdoor public sites, combined with surge arrestors, residual current detection and an emergency stop. Coastal or dusty locations should add the anti-corrosion coating and filter service kit.

How is maintenance handled when a power module fails?

Modules are hot-swappable from the front. A technician isolates the affected unit, slides it out and seats a pre-calibrated replacement while the second outlet keeps serving traffic. N plus one redundancy keeps rated output available throughout.

Does the station support solar and battery storage integration?

The DC bus is storage-ready. Solar MPPT or a BESS cabinet can feed the link directly, and the controller can cap grid import during peak tariffs. This suits microgrid and carport projects where demand charges dominate operating cost.

What payment options are available for public drivers?

RFID card, mobile app, QR code, ISO 15118 plug and charge and an optional POS terminal for contactless bank cards. All methods write to the same metered session record, so reconciliation stays simple. Connector options are listed on our EV charging connector page.

What output voltage range does the 60kW unit support?

The charger delivers 200V to 1000V DC at up to 125A, so it serves 400V passenger cars and 800V heavy vehicles from the same outlet. Constant power holds 60kW from about 500V upward, which shortens charging time on modern high-voltage packs.

How does DCDC architecture differ from a conventional AC-DC charger?

A DCDC stage accepts a DC bus from solar or battery storage and converts it directly, skipping one rectification step. That raises round-trip efficiency and lets the modular AC-DC platform operate during grid outages when paired with a BESS cabinet.

As a commercial DC fast charger, the platform is specified for operators who need predictable uptime from a DC fast charging station.

Fleet managers comparing a DC fast charging station against split systems value the single-cabinet service model of this DC fast charger.

The DC fast charging station ships with commissioning support, and every DC fast charger is backed by regional spares.

Choosing a DC fast charger with documented test reports keeps procurement audits simple for any commercial EV charger project.

As a commercial DC fast charger, the platform is specified for operators who need predictable uptime from a DC fast charging station.









  • Previous:
  • Next:

  • Write your message here and send it to us