The 100kW multi-gun DCDC solar-battery fast charger targets industrial microgrids and solar carports, where uptime and quick service access decide revenue. With CCS2 and CCS1 outlets, a 200V-1000V DC window and OCPP 1.6J connectivity, it delivers predictable high-power charging while keeping installation and commissioning simple. This DC fast charging station pairs high utilisation with low maintenance overhead.
![]() |
1. DCDC Solar-Battery Power Topology and Conversion ChainA single controller supervises rectification, isolation and metering, which keeps the power path short and trims conversion losses across the whole load range. Power conversion is separated from control logic, so firmware updates and diagnostics never interrupt an active charging session. Every cabinet is load tested before shipment and arrives with a wiring map covering contactors, fuses and surge arrestors for fast commissioning. An active front end feeds isolated DC/DC stages inside each cabinet, so grid harmonics stay low while output voltage follows whatever the battery management system requests. Bidirectional-ready bus design lets the same platform accept solar or battery energy storage input without a second conversion stage. Matching power modules are documented in the datasheet. |
2. 200V-1000V Wide Voltage Output With Constant PowerPre-charge sequencing limits inrush current, shielding vehicle contactors and DC link capacitors from stress during every plug-in. Precision metering at the outlet delivers Class B accuracy, so billed energy matches what the vehicle actually receives. Voltage and current limits are negotiated over the control pilot, then confirmed by the battery management system before the DC contactors close. Constant power operation holds the full 100kW from roughly 500V upward, so an 800V pack charges at rated rate instead of tapering early. Wide range voltage tracking keeps efficiency above 95 percent even when a deeply depleted pack pulls close to the 125A current ceiling. |
![]() |
![]() |
3. 20kW Hot-Swap Power Modules and N+1 RedundancyModule-level diagnostics flag degrading fans and capacitors long before they cause a stoppage, enabling condition-based maintenance. Replacement modules ship pre-calibrated, and the controller recognises a new unit automatically once it is fully seated. Speed-controlled fans and intelligent airflow keep acoustic noise near 65 dB, which suits residential, hospital and retail locations. Each module reports voltage, current, temperature and fan speed to the controller, which derates or isolates any unit drifting out of tolerance. N plus one redundancy keeps rated 100kW available even while one module is pulled for service, which matters on revenue-critical corridors. Commissioning takes under an hour with the guided setup wizard. Compatible EV charging connectors are listed separately. |
4. Dynamic Power Allocation Across Dual OutletsDynamic power allocation distributes available capacity across outlets in real time, letting a single vehicle draw the full 100kW. Priority rules can reserve one outlet for emergency fleets while the other follows a normal queue, all configured remotely. Matrix switching allows any module to serve any gun, so one cabinet can run a single 125A session or two lower-current sessions. Load balancing also watches site demand, trimming total draw when the transformer or building load approaches its limit. Operators set allocation rules per site, per connector or per tariff window through the cloud portal, with no on-site reprogramming. Site rules are tuned from the operator portal. |
![]() |
![]() |
5. Outdoor IP55 Enclosure Built for Public SitesOptional heating, ventilation and lighting kits extend operation to cold storage yards and dusty mining roads. The bonded anti-glare touchscreen stays readable in direct sunlight and remains responsive through gloved operation. Cable management hooks keep CCS2 and CCS1 leads off the ground, extending connector life in busy public car parks. Front and side service access is available, and the base frame accepts either anchor bolts or a concrete plinth. A powder-coated steel body with anti-corrosion treatment suits coastal, industrial and roadside installations. The enclosure is rated IP55, with filtered intake louvres and a sealed electronics compartment that shrugs off rain, dust and washdown. Installation drawings cover plinth and cable routing. |
6. Smart Payment, OCPP Management and Energy IntegrationOCPP 1.6J adds certificate handling and stronger message security for public networks that must satisfy national roaming rules. Drivers authenticate by RFID card, mobile app, QR code or ISO 15118 plug and charge, with an optional POS terminal for bank card payment. The controller exposes smart charging profiles, so a central system can cap site load during peak tariff periods. Remote diagnostics, firmware updates and tariff changes are pushed over the air, cutting truck rolls for routine maintenance. Local storage keeps sessions running if connectivity drops, then synchronises records once the link returns. Multi-language interface, configurable tariff screens and branded start pages help operators monetise the charging session itself. Backend integration follows the OCPP specification. |
![]() |
Deployment Support and Accessories
Projects usually pair the cabinet with Type 2 to Type 2 cables and a OCPP protocol controllers, all supplied from one factory. Engineering teams can review the company profile before order, while commercial questions go through the contact our team page. Standard builds ship in four to six weeks, and documentation covers wiring, grounding and network setup.
Frequently Asked Questions
Which OCPP version should an operator choose?
OCPP 1.6J covers the widest installed base of back offices today. OCPP 1.6J is specified here for certificate handling, plug and charge support and stronger message security. Both profiles work with standard roaming hubs, and the protocol controller datasheet explains the mapping.
What protection level is needed for roadside installation?
IP55 is the baseline for outdoor public sites, combined with surge arrestors, residual current detection and an emergency stop. Coastal or dusty locations should add the anti-corrosion coating and filter service kit.
How is maintenance handled when a power module fails?
Modules are hot-swappable from the front. A technician isolates the affected unit, slides it out and seats a pre-calibrated replacement while the second outlet keeps serving traffic. N plus one redundancy keeps rated output available throughout.
Does the station support solar and battery storage integration?
The DC bus is storage-ready. Solar MPPT or a BESS cabinet can feed the link directly, and the controller can cap grid import during peak tariffs. This suits microgrid and carport projects where demand charges dominate operating cost.
What payment options are available for public drivers?
RFID card, mobile app, QR code, ISO 15118 plug and charge and an optional POS terminal for contactless bank cards. All methods write to the same metered session record, so reconciliation stays simple. Connector options are listed on our EV charging connector page.
What output voltage range does the 100kW unit support?
The charger delivers 200V to 1000V DC at up to 125A, so it serves 400V passenger cars and 800V heavy vehicles from the same outlet. Constant power holds 100kW from about 500V upward, which shortens charging time on modern high-voltage packs.
As a commercial DC fast charger, the platform is specified for operators who need predictable uptime from a DC fast charging station.
Fleet managers comparing a DC fast charging station against split systems value the single-cabinet service model of this DC fast charger.
The DC fast charging station ships with commissioning support, and every DC fast charger is backed by regional spares.
Choosing a DC fast charger with documented test reports keeps procurement audits simple for any commercial EV charger project.
As a commercial DC fast charger, the platform is specified for operators who need predictable uptime from a DC fast charging station.
Fleet managers comparing a DC fast charging station against split systems value the single-cabinet service model of this DC fast charger.













