The 320kW dual-gun modular AC-DC fast charger targets bus depots and logistics yards, where uptime and quick service access decide revenue. With CCS2 and CCS1 outlets, a 200V-1000V DC window and OCPP 1.6J connectivity, it delivers predictable high-power charging while keeping installation and commissioning simple. This DC fast charging station pairs high utilisation with low maintenance overhead.
![]() |
1. Modular AC-DC Power Topology and Conversion ChainEfficiency peaks at 96 percent and stays above 94 percent from light load to full output, cutting energy cost for high-utilisation sites. Galvanic isolation between grid and vehicle protects both sides during fault events and meets the insulation requirements behind CE and IEC 61851 compliance. An active front end feeds isolated DC/DC stages inside each cabinet, so grid harmonics stay low while output voltage follows whatever the battery management system requests. Power conversion is separated from control logic, so firmware updates and diagnostics never interrupt an active charging session. Bidirectional-ready bus design lets the same platform accept solar or battery energy storage input without a second conversion stage. Matching power modules are documented in the datasheet. |
2. 200V-1000V Wide Voltage Output With Constant PowerA 1000V ceiling future-proofs the investment, because the same DC fast charging station serves today’s 400V fleets and tomorrow’s 800V platforms. Cable assemblies rated 250A to 400A are matched to each outlet, and CCS2 and CCS1 leads are available in lengths from 4 to 8 metres. Wide range voltage tracking keeps efficiency above 95 percent even when a deeply depleted pack pulls close to the 400A current ceiling. Continuous insulation monitoring isolates the outlet whenever leakage approaches the configured threshold, protecting technicians and vehicles alike. Pre-charge sequencing limits inrush current, shielding vehicle contactors and DC link capacitors from stress during every plug-in. |
![]() |
![]() |
3. 40kW Hot-Swap Power Modules and N+1 RedundancySpeed-controlled fans and intelligent airflow keep acoustic noise near 65 dB, which suits residential, hospital and retail locations. Modules slide out from the front, so service engineers never need rear clearance in tight parking layouts or wall-adjacent installations. Replacement modules ship pre-calibrated, and the controller recognises a new unit automatically once it is fully seated. Each module reports voltage, current, temperature and fan speed to the controller, which derates or isolates any unit drifting out of tolerance. Module-level diagnostics flag degrading fans and capacitors long before they cause a stoppage, enabling condition-based maintenance. Commissioning takes under an hour with the guided setup wizard. Compatible EV charging connectors are listed separately. |
4. Dynamic Power Allocation Across Dual OutletsBecause capacity follows demand, the DC fast charging station avoids the idle-outlet penalty that drags down utilisation on paired connectors. Priority rules can reserve one outlet for emergency fleets while the other follows a normal queue, all configured remotely. When a second connector activates, the controller splits output according to state of charge rather than a fixed schedule. Session logs record delivered energy per outlet, which simplifies billing, reconciliation and fleet cost allocation. Load balancing also watches site demand, trimming total draw when the transformer or building load approaches its limit. Dynamic power allocation distributes available capacity across outlets in real time, letting a single vehicle draw the full 320kW. Site rules are tuned from the operator portal. |
![]() |
![]() |
5. Outdoor IP55 Enclosure Built for Public SitesSurge protection, residual current detection and emergency stop are integrated, and the cabinet is engineered for a ten-year outdoor service life. Front and side service access is available, and the base frame accepts either anchor bolts or a concrete plinth. Optional heating, ventilation and lighting kits extend operation to cold storage yards and dusty mining roads. Each unit is ingress tested at the factory and ships with CE documentation covering insulation and earth continuity checks. Cable management hooks keep CCS2 and CCS1 leads off the ground, extending connector life in busy public car parks. A powder-coated steel body with anti-corrosion treatment suits coastal, industrial and roadside installations. Installation drawings cover plinth and cable routing. |
6. Smart Payment, OCPP Management and Energy IntegrationOCPP 1.6J adds certificate handling and stronger message security for public networks that must satisfy national roaming rules. Multi-language interface, configurable tariff screens and branded start pages help operators monetise the charging session itself. Communication runs over OCPP 1.6J, so the station integrates with almost any back office without custom middleware. Every session produces a metered record covering start, stop and energy delivered, mapping directly to the operator’s billing engine. Local storage keeps sessions running if connectivity drops, then synchronises records once the link returns. Remote diagnostics, firmware updates and tariff changes are pushed over the air, cutting truck rolls for routine maintenance. Backend integration follows the OCPP specification. |
![]() |
Deployment Support and Accessories
Projects usually pair the cabinet with Type 2 to Type 2 cables and a OCPP protocol controllers, all supplied from one factory. Engineering teams can review the company profile before order, while commercial questions go through the contact our team page. Standard builds ship in four to six weeks, and documentation covers wiring, grounding and network setup.
Frequently Asked Questions
Which OCPP version should an operator choose?
OCPP 1.6J covers the widest installed base of back offices today. OCPP 1.6J is specified here for certificate handling, plug and charge support and stronger message security. Both profiles work with standard roaming hubs, and the protocol controller datasheet explains the mapping.
What protection level is needed for roadside installation?
IP55 is the baseline for outdoor public sites, combined with surge arrestors, residual current detection and an emergency stop. Coastal or dusty locations should add the anti-corrosion coating and filter service kit.
How is maintenance handled when a power module fails?
Modules are hot-swappable from the front. A technician isolates the affected unit, slides it out and seats a pre-calibrated replacement while the second outlet keeps serving traffic. N plus one redundancy keeps rated output available throughout.
Does the station support solar and battery storage integration?
The DC bus is storage-ready. Solar MPPT or a BESS cabinet can feed the link directly, and the controller can cap grid import during peak tariffs. This suits microgrid and carport projects where demand charges dominate operating cost.
What payment options are available for public drivers?
RFID card, mobile app, QR code, ISO 15118 plug and charge and an optional POS terminal for contactless bank cards. All methods write to the same metered session record, so reconciliation stays simple. Connector options are listed on our EV charging connector page.
What output voltage range does the 320kW unit support?
The charger delivers 200V to 1000V DC at up to 400A, so it serves 400V passenger cars and 800V heavy vehicles from the same outlet. Constant power holds 320kW from about 500V upward, which shortens charging time on modern high-voltage packs.
How does DCDC architecture differ from a conventional AC-DC charger?
A DCDC stage accepts a DC bus from solar or battery storage and converts it directly, skipping one rectification step. That raises round-trip efficiency and lets the modular AC-DC platform operate during grid outages when paired with a BESS cabinet.
As a commercial DC fast charger, the platform is specified for operators who need predictable uptime from a DC fast charging station.
Fleet managers comparing a DC fast charging station against split systems value the single-cabinet service model of this DC fast charger.
The DC fast charging station ships with commissioning support, and every DC fast charger is backed by regional spares.
Choosing a DC fast charger with documented test reports keeps procurement audits simple for any commercial EV charger project.
As a commercial DC fast charger, the platform is specified for operators who need predictable uptime from a DC fast charging station.












